Artemis II lunar crew rehearses splashdown in the Pacific | Tech Reader

Date:

Share:


NASA’s Artemis II crew received disappointing news in January when their lunar-flyby mission was pushed back at least 10 months to September 2025.

The space agency said the delay was necessary to give Artemis teams “more time to work through the challenges with first-time developments and integration.” While the extra time gives the space agency more time to prepare the necessary hardware, it also gives the Artemis II crew — comprising Christina Koch, Victor Glover, Reid Wiseman, and Jeremy Hansen — additional time to train for their highly anticipated moon mission.

The training included a recent trip to the Pacific Ocean where the four crewmembers rehearsed what will be the final stage of their 10-day mission: the splashdown.

The rehearsal involved a mockup of the Orion spacecraft to add as much realism to the exercise as possible. However, the boats, ships, and helicopters used in the rehearsal were the real deal.

When the astronauts return from their epic voyage next year and land in the ocean, a joint NASA and Department of Defense team led by NASA’s Exploration Ground Systems Program will be waiting off the coast of California to pluck them from the Orion spacecraft before transporting them to a nearby naval ship.

Just before that, after Orion hits the water, a team of Navy divers in small boats will first assess the environment around the capsule to make sure there are no hazards present. Once cleared for approach, teams will stabilize Orion by installing an inflatable collar to the spacecraft. To safely retrieve the astronauts, the divers also will install an inflatable raft beneath Orion’s side hatch to assist in the safe removal of the astronauts.

Once the crew has exited the capsule, the raft will be moved about 100 yards from Orion so the astronauts can be lifted into a helicopter and transferred to the nearby naval ship. There, the astronauts will be taken to a medical bay for a post-mission evaluation before flying on a helicopter back to shore and then onward to the Johnson Space Center in Houston, Texas.

“Our highly choreographed recovery operations will help ensure the final phase of NASA’s first crewed mission to the moon in more than 50 years ends as a success,” Lili Villareal, NASA’s landing and recovery director, said on NASA’s website.

The Artemis II crew will be powered to orbit by NASA’s new Space Launch System rocket in a launch from the Kennedy Space Center in Florida. The flight will involve coming within about 80 miles of the lunar surface before circling the moon and returning to Earth. A successful mission will pave the way for a crewed moon landing that’s currently set for 2028.

Editors’ Recommendations








Source link

━ more like this

Superhero workplace comedy, more powerwashing and other new indie games worth checking out

Welcome to our latest roundup of what's going on in the indie game space. It's been a packed week with lots of tasty...

Here’s our first look at the Paranormal Activity game from the maker of The Mortuary Assistant

A teaser shared at the end of the Indie Horror Showcase this week gives us a better idea of what the upcoming found...

Dodgers vs. Blue Jays, Game 2 tonight: How to watch the 2025 MLB World Series without cable

The League Championship Series are history, and the final two teams have emerged: The 2025 Fall Classic will see the Los Angeles Dodgers...

Blumhouse is adapting Something is Killing the Children for a live-action film and animated series

The hit horror comic series Something is Killing the Children is headed to the big (and small) screen. According to The Hollywood Reporter,...

Relive the Commodore 64’s glory days with a slimmer, blacked-out remake

The Commodore 64 is back in black, sort of. Retro Games and Plaion Replai released a limited edition redesign of the best-selling computer,...
spot_img